Rick wrote:
> New transmission lines or the ones already there?
They will be tying into the two existing 500,000 volt transmission lines near Laughlin, NV. that are connected to the now closed Mohave coal fired power plant in Laughlin. Those two lines have been there since the 1970's and terminate at the SCE Lugo substation off of Ranchero Rd. in Hesperia.